National Infrastructure Plan - March 2010

Electricity and gas

The generation, transmission and distribution of electricity, and the production and distribution of natural gas, all occur within a competitive energy market. This means that all new energy-related infrastructure investment, whether it's building a new windfarm or constructing a new high-voltage transmission line, is based on the expected return on investment from those projects.

The Government, through the Electricity Commission, regulates the operation of the electricity industry and markets. The views of the Electricity Commission influence whether projects go ahead. For gas, the Gas Industry Company (an an industry-owned entity) undertakes a regulatory role in conjunction with the Government.

The energy investments outlined below respond to the need for significant increases in capacity.

Electricity generation

Investment in generation (notably from wind and gas) is growing steadily. The table below shows current planned investment in generation:

Table 6: Planned investment in generation
Project Fuel Owner/Operator Capacity (MW) In-Service Date Status
Northland
Kaipara Harbour pilot Marine Crest Energy 1 (pilot) 2011 Consent under appeal
Auckland
Rodney Gas Genesis 480 2013 Consent under appeal
Otahuhu C Gas Contact Energy 400 2015-2020 Consented
Awhitu Wind Genesis 18 2015-2020 Consented
Waikato
Centennial Drive - Tauhara Geothermal Contact Energy 20 2010 Under construction
Nga Awa Purua Geothermal Mighty River Power 132 2010 Under construction
Waipa Hydro Hydro Energy Ltd 7 2010 Under construction
Te Uku Wind WEL Network 84 2011 Consented
Te Mihi Geothermal Contact Energy 60 2013 Consented
Hauāuru mā raki Wind Contact Energy 540 2015-2020 Applied for consent
Taharoa Wind Taharoa C / PowerCoast 100 2015-2020 Consent under appeal
Taumatatorara Wind Ventus 44 2015-2020 Consented
Bay of Plenty 
Rotoma Geothermal Rotoma No. 1 Corporation 35 2015-2020 Applied for consent
Taranaki
Stratford Gas Contact Energy 200 2010 Under construction
Waverley Wind Allco Wind Energy 135 2011 Applied for consent
Mokau Hydro King Country Energy 10 2015-2020 Consent under appeal
Hawke's Bay
Titiokura Wind Unison / Roaring 40s 48 2010 Consented
Te Pohue wind farm Wind Hawke's Bay Wind Farm Ltd 225 2011 Consented
Waitahora Wind Contact Energy 149-177 2013 Consent under appeal
Manawatu
Te Rere Hau Stage 4 Wind NZ Windfarms 15 2010 Consented
Central Wind (Moawhango) Wind Meridian Energy 120-130 2015-2020 Consent under appeal
Te Rere Hau Extension Wind NZ Windfarms 28 2015-2020 Applied for consent
Turitea Wind Mighty River Power 335 2015-2020 Applied for consent
Wellington
Cook Strait Marine Energy pilot Marine Neptune Power 1 (pilot) 2011 Consented
Long Gully Wind Mighty River Power 12.5 2015-2020 Applied for consent
Mill Creek Wind Meridian Energy 71 2015-2020 Consent under appeal
Marlborough
Wairau Hydro TrustPower 70 2012 Consent under appeal
Canterbury
Belfast Diesel Orion 11.5 2012 Consented
Bromley Diesel Orion 11.5 2012 Consented
North Bank Tunnel Hydro Meridian Energy 200-280 2015-2020 Consent under appeal
Rakaia River Hydro Ashburton Com. Water Trust 16 2015-2020 Consented
Mt Cass Wind MainPower 41-69 2015-2020 Consent under appeal
West Coast
Amethyst Hydro Westpower / Harihari Hydro Ltd 6 2011 Consented
Arnold (Dobson) Hydro TrustPower 46 2011 Consent under appeal
Mokihinui Hydro Meridian Energy 85 2013 Applied for consent
Matiri Hydro New Zealand Energy Ltd 5 2015-2020 Applied for consent
Stockton Plateau Hydro Hydro Developments Ltd 25-50 2015-2020 Applied for consent
Otago
Mahinerangi Wind TrustPower 200 2011 Consented
Project Hayes Wind Meridian Energy 630 2011 Consent under appeal
Hawea Control Gate Retrofit Hydro Contact Energy 17 2012 Consented
Southland
Kaiwera Downs Wind TrustPower 240 2015-2020 Consented
Mt Stuart Wind Pionner Generation 6 2015-2020 Applied for consent

Source: Electricity Commission: Generation Projects 2009

Electricity transmission: Transpower

Transpower is refreshing its grid development strategy in a project called “Transmission 2040”. The strategy produced by Transmission 2040 will outline how Transpower will think when developing the national grid over the next 40 years, focussing on how changes in technology (both on and off grid) will be approached. The annual planning report presents Transpower's long-term approach to network investment, such as major upgrades announced to the North Island's grid and the inter-island HVDC link. See the following table for a summary of projects which Transpower is proposing, which are either committed (approved by the Electricity Commission) or not committed (pending approval).

Table 7: Summary of Transpower projects
Project Total Cost $M In-Service Date Committed (Y/N)
North Island
Otahuhu Substation Diversity 83 2010 Y
Marsden Bus Security Upgrade 7 2010 Y
Maungatapere Bus Security Upgrade 4 2010 Y
Bombay Bus Security Upgrade 5 2010 Y
Redclyffe Bus Security Upgrade 2 2010 Y
Wanganui-Statford Transmission Line 44 2010 Y
Masterton-Mangamaire-Woodville Line Conductor Replacement 17 2011 Y
Wilton 110 kV Interconnection Transformer Replacement 10 2011 Y
Western Bay of Plenty Upgrade  2011 N
North Island Grid Upgrade 824 2010-2012 Y
HVDC Inter-island Link Pole 3 Project 672 2012 Y
Upper North island Reactive Power  2012 N
Wairakei to Whakamaru New Transmission Line Project (the Wairakei Ring) 141 2013 Y
North Auckland and Northland Grid Upgrade Project (NAAN project) 473 2014 Y
South Island
West Coast Grid Upgrade 19 2011 Y
Lower Waitaki Valley 2013 N
Upper South Island Grid Upgrade 2013 N
Lower South Island Reliability N
Lower South Island Renewables ~150 N

Source: Transpower

Gas

Contact Energy has a gas storage project under way. It will cost approximately $250 million. Through a combination of new gas, compression and new wells, the Ahuroa reservoir will be re-pressured and able to store gas until it is economic to use it.

Further details do not appear to be publicly available.